Situation: For a repair, John has to use a Primer, a Basecoat and a Clearcoat. This resulted in three mixes for each product.
John wants to link all the three to only a single WO he created for the repair.
- Add the same work order number to all the mixes
- There is no limitation how many mixes can be assigned to a work order as long as the Work Order is not closed.